Matt's RV-8 Project



Matt Dralle's RV-8 Project
' style=
Date:  8-16-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Instrument Panel Loaded

And BAM! Just that fast its starting to look like an airplane again! I installed all of the instruments into the instrument panel tonight and, wow, did it feel like things were moving along! Just add wires! I'm starting to feel like this wiring process is going to go much faster this time. Again, not a lot of "figuring out", just some implementation. This time too, I have schematics that I drew for the whole system so the harness construction should be substantially quicker. Still, there's a LOT of labels to be printed and installed. I kept most of the label templates I used, but they aren't particularly organized. It will speed that process along as well, though.

Exciting times...
' style=

Instrument Panel Loaded

Instrument Panel Loaded

' style=

Instrument Panel Loaded

Instrument Panel Loaded

' style=

Instrument Panel Loaded

Instrument Panel Loaded

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.