Matt Dralle's RV-8 Project
RV-8
Empennage
7-4-2008
< Previous Log Entry
Next Log Entry >
Date:
7-4-2008
Number of Hours:
6.00
Manual Reference:
Brief Description:
Fabbed Left Elevator, Deburred Right Elevator Skin
Fabbed up the Left Elevator sans the counter balance. Fabbed up trim tab. Deburred and dimpled right Elevator skin and understructure parts including counter balance.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1853
3140
Avionics
199
495
Bose A20 Headsets
1
8
Electrical
61
172
Empennage
98
186
Engine
278
335
Fuselage
562
1053
Hangar
8
3
Interior
44
107
Miscellaneous
27
30
Painting
1
0
Prop
19
20
Rebuild - TheMishap
7
7
Rebuild - TheProcess
334
474
Testing
29
14
Tools
4
4
Wings
181
232
Copyright © 2008-2024 Matt Dralle. All Rights Reserved.