Matt's RV-8 Project



Matt Dralle's RV-8 Project
' style=
Date:  9-14-2008
Number of Hours:  20.00
Manual Reference:  
Brief Description:  Aft Main Spar Floorboards

Fabricated and trial assembled all of the floorboard components for the areas aft of the main spar. Fabricated and installed the Flap weldment brackets. Installed platenuts in several places. Primed all of the undersides of all floorboards. Left topside bare for powder coating later. Screwed up and primed the wrong side of the baggage area rear skin... Crap.
' style=

Fuselage Matched Drilled

Fuselage Matched Drilled

' style=

All Floorboards Match Drilled and Fabricated

All Floorboards Match Drilled and Fabricated

' style=

Floorboards Test Fit

Floorboards Test Fit

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.