Matt's RV-8 Project



Matt Dralle's RV-8 Project
' style=
Date:  10-9-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Bent and Installed Right Brake Lines - Part 2

The orange glow is a "nightlight" and odd digtal camera "color balance". Snaking those brake lines around the fuel vents and just inside the gear towers in general is a pain in the a**; I'm just saying...
' style=

Brake Lines Snaked In Gear Tower Around Fuel Vent Lines

Brake Lines Snaked In Gear Tower Around Fuel Vent Lines

' style=

Brake Lines Snaked In Gear Tower Around Fuel Vent Lines

Brake Lines Snaked In Gear Tower Around Fuel Vent Lines

' style=

Brake Lines Snaked In Gear Tower Around Fuel Vent Lines

Brake Lines Snaked In Gear Tower Around Fuel Vent Lines

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.