Matt's RV-8 Project



Matt Dralle's RV-8 Project
' style=
Date:  8-11-2009
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Glam-shots - Ready For Engine Install - Part 3
' style=

RV-8 Fuselage On The Drive Way, Craig and Matt

RV-8 Fuselage On The Drive Way, Craig and Matt

' style=

RV-8 Fuselage Tucked Back In The Shop

RV-8 Fuselage Tucked Back In The Shop

' style=

RV-8 Fuselage Tucked Back In The Shop

RV-8 Fuselage Tucked Back In The Shop

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.