Matt's RV-8 Project



Matt Dralle's RV-8 Project
' style=
Date:  8-7-2009
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Wing To Fuselage Fairings - Part 2

Today I realized that the upper fiberglass gear fairings really need to be fit, mounted, and installed while the wings and wing fairings are installed. So, rather than start on the Engine mounting like I was hoping for this weekend, I'm going work on those fairings next. I will do the lower gear fairings later when I'm doing other fiberglass work like the bezel for the windshield.
' style=

Right Wing Ready For Fairing Installation - Note Fuel Lines

Right Wing Ready For Fairing Installation - Note Fuel Lines

' style=

Right Wing Ready For Fairing Installation

Right Wing Ready For Fairing Installation

' style=

Left Wing Ready For Fairing Installation - Note Fuel Lines

Left Wing Ready For Fairing Installation - Note Fuel Lines

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.