Matt's RV-8 Project



Matt Dralle's RV-8 Project
273 Logs Found 
First Photo
Date

Work Log Summary

EGT Replacement On #2 Cylinder
07-25-2010
EGT Probe Replacement #2 Cylinder
Oil Cooler Flange After Modifications
04-17-2010
Oil Cooler Mounting Flange Modifications - Part 2
Oil Cooler Flange Before Modifications
04-17-2010
Oil Cooler Mounting Flange Modifications - Part 1
47k Ohm Resistors Added
04-17-2010
Bias Resistors For Westach Hall-Effect RPM Sensors
New Single Fitting PSI Transducer Fitting
04-16-2010
New Fuel Pressure Transducer Fitting
YouTube Video - Full HD!
04-13-2010
Instrumentation Check Out
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 16
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 15
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 14
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 13
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 12
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 11
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 10
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 09
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 08
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 07
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 06
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 05
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 04
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 03
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 02
RV-8 / Lycoming IO-390 First Start
04-10-2010
Lycoming IO-390 First Engine Start - Part 01
Ignition Harness Routing - Right Side
02-27-2010
Spark Plugs & Ignition Harness - Part 6
Lower Left Harness & Teflon Wire Wrap Installed
02-27-2010
Spark Plugs & Ignition Harness - Part 5
Lower RIght Harness Installed & Teflon Wrapped
02-27-2010
Spark Plugs & Ignition Harness - Part 4
Upper Right Spark Plugs Installed
02-27-2010
Spark Plugs & Ignition Harness - Part 3
Upper Left Side Spark Plugs Installed
02-27-2010
Spark Plugs & Ignition Harness - Part 2
Spark Plug Installation Stuff
02-27-2010
Spark Plugs & Ignition Harness - Part 1
8 Quarts Of Aircraft Oil Required!
02-27-2010
Oil Filler Tube Installation - Part 2
Oil Fill Hole In Crankcase - Capped
02-27-2010
Oil Filler Tube Installation - Part 1
Righthand Side Bottom Baffle Tie Up
11-20-2009
Engine Baffle Bottom Tie Up
Rubber Seals Added To Baffle Pieces
11-06-2009
Engine Baffle Pieces Powdercoated - Part 5
Rubber Seals Added To Baffle Pieces
11-06-2009
Engine Baffle Pieces Powdercoated - Part 4
Baffle Pieces Installed On Engine
11-06-2009
Engine Baffle Pieces Powdercoated - Part 3
Engine Baffle Pieces Powdercoated
11-06-2009
Engine Baffle Pieces Powdercoated - Part 2
Engine Baffle Pieces Powdercoated
11-06-2009
Engine Baffle Pieces Powdercoated - Part 1
FWF Fabrication Complete
10-26-2009
FWF Fabrication Complete - Part 2
FWF Fabrication Complete
10-26-2009
FWF Fabrication Complete - Part 1
Baffles Ready For Power Coating
10-26-2009
Engine Baffle Finishing And Riveting - Part 5
Left Front Baffle Assembly
10-26-2009
Engine Baffle Finishing And Riveting - Part 4
Right Front Baffle Assembly
10-26-2009
Engine Baffle Finishing And Riveting - Part 3
Misc. Baffle Pieces
10-26-2009
Engine Baffle Finishing And Riveting - Part 2
Engine Baffle Pieces Finished
10-26-2009
Engine Baffle Finishing And Riveting - Part 1
Baffle Pass-Throughs For Ignition Harness
10-25-2009
Ignition Harness Pass-Through In Baffles - Part 5
Left Top Harness Wires Pass Through Baffle
10-25-2009
Ignition Harness Pass-Through In Baffles - Part 4
#8 Platenuts Added
10-25-2009
Ignition Harness Pass-Through In Baffles - Part 3
1.362
10-25-2009
Ignition Harness Pass-Through In Baffles - Part 2
Initial .75
10-25-2009
Ignition Harness Pass-Through In Baffles - Part 1
Sniffle Valve Installation
10-24-2009
Lycoming Siffle Valve Installation
Fuel Pump Overflow Line Installation
10-24-2009
Fuel Pump Overflow Line
Engine Breather Tube Over Exhaust Pipe
10-24-2009
Engine Breather Tube Installation - Part 2
Engine Breather Tube
10-24-2009
Engine Breather Tube Installation - Part 1
Blast Tube - Right Mag
10-22-2009
Accessory Cooling Blast Tubes - Part 2
Blast Tube - Primary Alternator
10-22-2009
Accessory Cooling Blast Tubes - Part 1
Firewall Heater Control
10-21-2009
Cabin Heat Muff Installation - Part 4
Heat Muff Installation Complete
10-21-2009
Cabin Heat Muff Installation - Part 3
Heat Muff Assembled
10-20-2009
Cabin Heat Muff Installation - Part 2
Heat Muff Pieces
10-20-2009
Cabin Heat Muff Installation - Part 1
Engine Baffle Gaskets - Completed Fabrication
10-19-2009
Rubber Baffling Gasket Fabrication - Part 10
Engine Baffle Gaskets - Completed Fabrication
10-19-2009
Rubber Baffling Gasket Fabrication - Part 09
Engine Baffle Gaskets - Completed Fabrication
10-18-2009
Rubber Baffling Gasket Fabrication - Part 08
Engine Baffle Gaskets - Lower Cowling Installation
10-18-2009
Rubber Baffling Gasket Fabrication - Part 07
Engine Baffle Gaskets - Lower Cowling Installation
10-18-2009
Rubber Baffling Gasket Fabrication - Part 06
Engine Baffle Gaskets - Rubber Gaskets Cutout
10-18-2009
Rubber Baffling Gasket Fabrication - Part 05
Engine Baffle Gaskets - Paper Patterns
10-17-2009
Rubber Baffling Gasket Fabrication - Part 04
Engine Baffle Gaskets - Paper Patterns
10-17-2009
Rubber Baffling Gasket Fabrication - Part 03
Engine Baffle Gaskets - Paper Patterns
10-17-2009
Rubber Baffling Gasket Fabrication - Part 02
Engine Baffle Gaskets - Paper Patterns
10-17-2009
Rubber Baffling Gasket Fabrication - Part 01
CB8-11 - IO-390 - Version 1.1 - September 22 2009
10-16-2009
Custom IO-390 Baffle Templates - Part 2
CB8-1A & CB8-1B - IO-390 - Version 1.0 - October 12 2009
10-15-2009
Custom IO-390 Baffle Templates - Part 1
SW10610R Mounting Complete
10-11-2009
IO-390 Oversized Oil Cooler Installation - Part 10
Oil Cooler Mounted To Baffle/Doubler
10-11-2009
IO-390 Oversized Oil Cooler Installation - Part 09
.063 Angle Stiffener Added To Rear Center Baffle
10-11-2009
IO-390 Oversized Oil Cooler Installation - Part 08
Baffle/Doubler/Stiffener Trrail Fit
10-11-2009
IO-390 Oversized Oil Cooler Installation - Part 07
Baffle/Doubler/Oil Cooler Trial Fit
10-11-2009
IO-390 Oversized Oil Cooler Installation - Part 06
Baffle/Double Trial Fit
10-10-2009
IO-390 Oversized Oil Cooler Installation - Part 05
.063 Full Shadow Doubler Cut
10-10-2009
IO-390 Oversized Oil Cooler Installation - Part 04
Oil Cooler Trial Fit
10-10-2009
IO-390 Oversized Oil Cooler Installation - Part 03
Stock Left Rear Baffle Marked
10-10-2009
IO-390 Oversized Oil Cooler Installation - Part 02
Stewart Warner 10610R Oil Cooler
10-10-2009
IO-390 Oversized Oil Cooler Installation - Part 01
Alternate Air Door - Cockpit Control - Open
10-09-2009
Alternate Air Door Installation - Part 5
Alternate Air Door - Control Linkage - Half Open
10-09-2009
Alternate Air Door Installation - Part 4
Alternate Air Door - Door Added - Closed
10-09-2009
Alternate Air Door Installation - Part 3
Alternate Air Door - Mount Drilled
10-08-2009
Alternate Air Door Installation - Part 2
Alternate Air Door Parts
10-08-2009
Alternate Air Door Installation - Part 1
Snorkel / Alternator Installation Complete
10-07-2009
Snorkel/Alt Clearance Modifications - Part 5
Alternator Impressions In Snorkel
10-07-2009
Snorkel/Alt Clearance Modifications - Part 4
Alt Mount & Strut Correctly Installed
10-06-2009
Snorkel/Alt Clearance Modifications - Part 3
Snorkel Heated And Soften
10-06-2009
Snorkel/Alt Clearance Modifications - Part 2
Alternator Mount Hits Snorkel
10-06-2009
Snorkel/Alt Clearance Modifications - Part 1
Snorkel & Air Cleaner Installation Complete
10-05-2009
Snorkel Intake Installation - Part 11
Snorkel Installation Complete
10-04-2009
Snorkel Intake Installation - Part 10
Platenuts Added To Snorkel
10-04-2009
Snorkel Intake Installation - Part 09
Left Floor Baffle Modifications Complete
10-04-2009
Snorkel Intake Installation - Part 08
Stiffeners Added To Left Floor Baffle
10-04-2009
Snorkel Intake Installation - Part 07
Mounting Flanges Added To Snorkel
10-03-2009
Snorkel Intake Installation - Part 06
Snorkel Fit To Left Floor Baffle
10-03-2009
Snorkel Intake Installation - Part 05
Snorkel Flage Drilled & Finished
10-03-2009
Snorkel Intake Installation - Part 04
Skytec NL Flange Removed With 3
10-03-2009
Snorkel Intake Installation - Part 03
Throttle Body Intake
10-03-2009
Snorkel Intake Installation - Part 02
Shedule 40 Cap - 2 3/8
10-02-2009
Snorkel Intake Installation - Part 01
Trial Cowling Fit
10-01-2009
Cutting Baffles To Match Cowling Contour - Part 11
Contour Cutting Complete
10-01-2009
Cutting Baffles To Match Cowling Contour - Part 10
Contour Cutting Complete
09-30-2009
Cutting Baffles To Match Cowling Contour - Part 09
Final Contour Cutting
09-30-2009
Cutting Baffles To Match Cowling Contour - Part 08
Inital Rough Cut On Dotted Line
09-30-2009
Cutting Baffles To Match Cowling Contour - Part 07
Dotted Cut Line
09-29-2009
Cutting Baffles To Match Cowling Contour - Part 06
Contour Marked From Paper Clips
09-29-2009
Cutting Baffles To Match Cowling Contour - Part 05
Paper Clip Contour After Pressing Top Cowling Down
09-29-2009
Cutting Baffles To Match Cowling Contour - Part 04
Paper Clip Contour After Pressing Top Cowling Down
09-28-2009
Cutting Baffles To Match Cowling Contour - Part 03
Paper Clips Added To Baffles
09-28-2009
Cutting Baffles To Match Cowling Contour - Part 02
Initial Cowling Fit Over Baffles
09-28-2009
Cutting Baffles To Match Cowling Contour - Part 01
Cable Clears Injector Nicely
09-27-2009
Front Mounted Prop Governor Cable Routing - Part 2
Prop Cable Up Thru Rear Baffle
09-27-2009
Front Mounted Prop Governor Cable Routing - Part 1
Right Front Baffle Assembly
09-26-2009
Engine Baffle & Bracket Assembly - Part 7
Right Front Baffle Assembly
09-26-2009
Engine Baffle & Bracket Assembly - Part 6
Front Part Of Baffle Removable
09-26-2009
Engine Baffle & Bracket Assembly - Part 5
Cutout For Prop Governor Added
09-26-2009
Engine Baffle & Bracket Assembly - Part 4
Front Baffles Assembled
09-26-2009
Engine Baffle & Bracket Assembly - Part 3
Front Left Baffle Assembly
09-26-2009
Engine Baffle & Bracket Assembly - Part 2
Front Left Baffle Assembly
09-26-2009
Engine Baffle & Bracket Assembly - Part 1
09-25-2009
Baffle Installation
09-24-2009
Baffle Installation
09-23-2009
Baffle Installation
09-22-2009
Baffle Installation
09-21-2009
Baffle Installation
09-20-2009
Baffle Installation
09-19-2009
Baffle Installation
New Left Baffle Template - Installed
09-18-2009
Custom Front Baffles For IO-390 - Part 7
New Left Baffle Template - Cut Out Of Metal
09-18-2009
Custom Front Baffles For IO-390 - Part 6
New Left Baffle Template
09-18-2009
Custom Front Baffles For IO-390 - Part 5
New IO-390 Right Front Baffle
09-18-2009
Custom Front Baffles For IO-390 - Part 4
Front Baffle Cardboard Templates - Right Side
09-17-2009
Custom Front Baffles For IO-390 - Part 3
Front Floor Baffle Cardboard Template
09-17-2009
Custom Front Baffles For IO-390 - Part 2
Front Floor Baffle Cardboard Template
09-17-2009
Custom Front Baffles For IO-390 - Part 1
Cowling Complete!
09-14-2009
Cowling Installation Complete! - Part 4
Cowling Complete!
09-14-2009
Cowling Installation Complete! - Part 3
Cowling Complete!
09-14-2009
Cowling Installation Complete! - Part 2
Cowling Complete!
09-14-2009
Cowling Installation Complete! - Part 1
Lower Cowling Hinges
09-13-2009
Riveting & Glassing Hinges To Bot Cowling - Part 5
Lower Cowling Fit Check To Fuselage
09-13-2009
Riveting & Glassing Hinges To Bot Cowling - Part 4
Lower Cowling Fit Check To Fuselage
09-13-2009
Riveting & Glassing Hinges To Bot Cowling - Part 3
Lower Cowling Riveting & Glassing Complete
09-13-2009
Riveting & Glassing Hinges To Bot Cowling - Part 2
Lower Cowling Riveting & Glassing Complete
09-13-2009
Riveting & Glassing Hinges To Bot Cowling - Part 1
Initial Baffle Fitting Complete
09-13-2009
Initial Engine Baffle Fitting - Part 5
Left Rear Baffle Installed
09-13-2009
Initial Engine Baffle Fitting - Part 4
Right Rear Baffle Installed
09-13-2009
Initial Engine Baffle Fitting - Part 3
Left Side Baffles Installed
09-13-2009
Initial Engine Baffle Fitting - Part 2
Van's IO-360 Baffle Kit
09-13-2009
Initial Engine Baffle Fitting - Part 1
Upper Cowling Hinges Complete
09-12-2009
Riveting & Glassing Hinges To Top Cowling - Part 5
Upper Cowling Hinges Complete
09-12-2009
Riveting & Glassing Hinges To Top Cowling - Part 4
Upper Cowing Hinge With Resin & Rivets
09-12-2009
Riveting & Glassing Hinges To Top Cowling - Part 3
Upper Cowing Hinge With Resin & Clecos
09-12-2009
Riveting & Glassing Hinges To Top Cowling - Part 2
Upper Cowling Hinge Holes
09-12-2009
Riveting & Glassing Hinges To Top Cowling - Part 1
Inner Cowling Screws - Left Side
09-11-2009
Adding Upper/Lower Hinges To Cowlings - Part 4
Upper Hinge Drilled - Left Side
09-11-2009
Adding Upper/Lower Hinges To Cowlings - Part 3
Lower Hinge Cleco-Clamped In Place - Left Side
09-11-2009
Adding Upper/Lower Hinges To Cowlings - Part 2
Lower Hinge Rivet Line Marked - Right Side
09-11-2009
Adding Upper/Lower Hinges To Cowlings - Part 1
Upper & Lower Cowl Form Perfect Butt-Joint
09-07-2009
Fitting Upper & Lower Cowlings Together - Part 7
Lower Cowl Filed
09-07-2009
Fitting Upper & Lower Cowlings Together - Part 6
Lower Cowl Ready For Cutting
09-07-2009
Fitting Upper & Lower Cowlings Together - Part 5
Lower Cowl Marked Using Upper Cowl
09-06-2009
Fitting Upper & Lower Cowlings Together - Part 4
Dremel #409 Cutoff Wheel
09-06-2009
Fitting Upper & Lower Cowlings Together - Part 3
Right Side Marked
09-06-2009
Fitting Upper & Lower Cowlings Together - Part 2
Center Marked, Paperpunch Tape Line
09-06-2009
Fitting Upper & Lower Cowlings Together - Part 1
Lower Cowling Drilled To Hinge
09-06-2009
Fitting The Lower Cowling - Part 4
Lower Cowl Hinges Riveted To Fuselage
09-06-2009
Fitting The Lower Cowling - Part 3
Lower Cowl Marked
09-06-2009
Fitting The Lower Cowling - Part 2
Lower Cowl Hinges Cut
09-06-2009
Fitting The Lower Cowling - Part 1
Hinge Detail
09-05-2009
Oil Fill Door Installation - Part 5
.063 Oil Door - Hinge & Cam Lock Added
09-05-2009
Oil Fill Door Installation - Part 4
.063 Oil Door Contour Bent And Finish Filed
09-05-2009
Oil Fill Door Installation - Part 3
Rough Cut
09-05-2009
Oil Fill Door Installation - Part 2
Fiberglass Cowling Marked
09-05-2009
Oil Fill Door Installation - Part 1
Upper Cowling Fit & Drilled
09-05-2009
Fitting The Upper Cowling - Part 2
Fuselage Marked 2
09-05-2009
Fitting The Upper Cowling - Part 1
Hinge Drilled To Firewall
09-01-2009
Rear Top Cowling Hinge Installation - Part 3
Skin Taped To Firewall To Hold In Place For Drilling Hinges
09-01-2009
Rear Top Cowling Hinge Installation - Part 2
Skin Taped To Firewall To Hold In Place For Drilling Hinges
09-01-2009
Rear Top Cowling Hinge Installation - Part 1
FWF Wiring Complete
08-29-2009
Firewall Forward Wiring Complete - Part 3
FWF Wiring Complete
08-29-2009
Firewall Forward Wiring Complete - Part 2
FWF Wiring Complete
08-29-2009
Firewall Forward Wiring Complete - Part 1
Left Side EGT/CHT Complete
08-27-2009
EGT & CHT Reterminating & Wiring - Part 6
Left Side EGT/CHT Connections
08-27-2009
EGT & CHT Reterminating & Wiring - Part 5
Left Side EGT/CHT Probes Reterminated
08-27-2009
EGT & CHT Reterminating & Wiring - Part 4
Right Side EGT/CHT Complete
08-26-2009
EGT & CHT Reterminating & Wiring - Part 3
Right Side EGT/CHT Connections
08-26-2009
EGT & CHT Reterminating & Wiring - Part 2
Right Side EIS-4000 Connections Terminated
08-26-2009
EGT & CHT Reterminating & Wiring - Part 1
Carb Temperature Probe
08-25-2009
Carburetor Temperature Probe Wiring - Part 2
Wires Terminated
08-25-2009
Carburetor Temperature Probe Wiring - Part 1
Installation Complete
08-24-2009
Fuel Pressure Probe Installation & Wiring - Part 3
FuelChec DX PSI Wiring
08-24-2009
Fuel Pressure Probe Installation & Wiring - Part 2
FuelChec DX Fuel PSI Left - EIS-4000 Fuel PSI Right
08-24-2009
Fuel Pressure Probe Installation & Wiring - Part 1
Starter Connection Complete
08-23-2009
Starter #2 Cable Installation - Part 3
Connection To Starter Solenoid
08-23-2009
Starter #2 Cable Installation - Part 2
#2 Started Cable Fabbed
08-23-2009
Starter #2 Cable Installation - Part 1
Installation Complete
08-23-2009
Secondary 20 Amp Alternator Connections - Part 2
B&C External Alternator Regulator
08-23-2009
Secondary 20 Amp Alternator Connections - Part 1
Engine Ground Connection
08-23-2009
Engine Ground Connection
Primarly Alternator Field OFF
08-22-2009
Primary Alternator Installation & Wiring - Part 4
60 Amp Current Limiter Added
08-22-2009
Primary Alternator Installation & Wiring - Part 3
Alternator Installed
08-22-2009
Primary Alternator Installation & Wiring - Part 2
Plane Power 60 Amp Primary Alternator
08-22-2009
Primary Alternator Installation & Wiring - Part 1
Manifold Pressure Transducer Mounted In Cabin - Note Firewall Fitting
08-22-2009
Manifold Pressure Engine Connection - Part 2
Manifold Pressure Line
08-22-2009
Manifold Pressure Engine Connection - Part 1
Oil Temperature Wiring
08-21-2009
Oil Pressure & Temperature Probes - Part 3
Oil Pressure Wiring Complete
08-21-2009
Oil Pressure & Temperature Probes - Part 2
Oil Pressure Transducer and Line
08-21-2009
Oil Pressure & Temperature Probes - Part 1
RPM Sensor Connectors - Allows For Easy Swapping
08-20-2009
RPM Measurement Using Hall Effect Sensor - Part 2
Westach Part # 720-14R - Available From Aircraft Spruce
08-20-2009
RPM Measurement Using Hall Effect Sensor - Part 1
Exhaust Pipes Drilled For EGT Probes - Left Side
08-19-2009
EGT Probe Mounting - Part 3
Probes Mounted - Right Side
08-19-2009
EGT Probe Mounting - Part 2
EGT Probes
08-19-2009
EGT Probe Mounting - Part 1
Probe Installed - Right Side
08-19-2009
CHT Probe Mounting - Part 2
CHT Probes
08-19-2009
CHT Probe Mounting - Part 1
Closeup Of Matronics Pressure Transducers and Fittings
08-18-2009
FWF Fuel Line Installation - Part 4
Fuel Line Connected From Throttle Body Up Through Baffling
08-18-2009
FWF Fuel Line Installation - Part 3
Closeup Of AN Fitting On Firewall With Hose Attached
08-18-2009
FWF Fuel Line Installation - Part 2
AN Fuel Fitting - Skin Stiffener
08-18-2009
FWF Fuel Line Installation - Part 1
Throttle Closed
08-17-2009
Mounting & Rigging The Throttle Cable - Part 3
Throttle Mount Safety Wired
08-17-2009
Mounting & Rigging The Throttle Cable - Part 2
Throttle Cable - Drilled #52 By Builder!
08-17-2009
Mounting & Rigging The Throttle Cable - Part 1
Mixture & Prop Controls
08-17-2009
Mounting & Rigging The Mixture Control - Part 3
Mixture Control Reverser
08-17-2009
Mounting & Rigging The Mixture Control - Part 2
Control Reversing Contraption
08-17-2009
Mounting & Rigging The Mixture Control - Part 1
Vacuum Pump Boss Mount
08-16-2009
Mounting The Secondary 20A B&C Alternator
Governor Mounting - Minimum RPM Setting
08-16-2009
Mounting The Prop Governor - Part 4
Governor Mounting - Control Cable Bracket Mounted
08-16-2009
Mounting The Prop Governor - Part 3
Governor Mounting - McCauley Unit Mounted
08-16-2009
Mounting The Prop Governor - Part 2
Governor Mounting - Covered Boss
08-16-2009
Mounting The Prop Governor - Part 1
Vetterman 4-into-4 Exhaust - Mounting
08-15-2009
Vetterman 4-into-4 Exhaust System - Part 3
Vetterman 4-into-4 Exhaust - Mounting Straps
08-15-2009
Vetterman 4-into-4 Exhaust System - Part 2
Vetterman 4-into-4 Exhaust - Ready For Installation
08-15-2009
Vetterman 4-into-4 Exhaust System - Part 1

08-15-2009
Engine Mounting - The CAM Shots - Part 9

08-15-2009
Engine Mounting - The CAM Shots - Part 8

08-15-2009
Engine Mounting - The CAM Shots - Part 7

08-15-2009
Engine Mounting - The CAM Shots - Part 6

08-15-2009
Engine Mounting - The CAM Shots - Part 5

08-15-2009
Engine Mounting - The CAM Shots - Part 4

08-15-2009
Engine Mounting - The CAM Shots - Part 3

08-15-2009
Engine Mounting - The CAM Shots - Part 2

08-15-2009
Engine Mounting - The CAM Shots - Part 1
IO-390 Engine Mounting - Mounting Complete!
08-15-2009
Engine Mounting - Part 7
IO-390 Engine Mounting - Mounting Complete!
08-15-2009
Engine Mounting - Part 6
IO-390 Engine Mounting - Top Bolts In
08-15-2009
Engine Mounting - Part 5
IO-390 Engine Mounting - Top Bolts In
08-15-2009
Engine Mounting - Part 4
IO-390 Engine Mounting - Hoisted Into Position
08-15-2009
Engine Mounting - Part 3
IO-390 Engine Mounting - Connected To Hoist
08-15-2009
Engine Mounting - Part 2
Aerobatic Engine Vibration Mounts
08-15-2009
Engine Mounting - Part 1
Standard vs Aerobatic Engine Vibration Mounts
08-14-2009
Standard vs Aerobatic Engine Vibration Mounts
Initial Test Run Documentation
01-29-2009
Aero Sport Power IO-390 Test Run - Part 6
Lycoming IO-390 Test Stand Run-In
01-29-2009
Aero Sport Power IO-390 Test Run - Part 5
Lycoming IO-390 Test Stand Run-In
01-29-2009
Aero Sport Power IO-390 Test Run - Part 4
Lycoming IO-390 Test Stand Run-In
01-29-2009
Aero Sport Power IO-390 Test Run - Part 3
Lycoming IO-390 Test Stand Run-In
01-29-2009
Aero Sport Power IO-390 Test Run - Part 2
Lycoming IO-390 Test Stand Run-In
01-29-2009
Aero Sport Power IO-390 Test Run - Part 1
Lycoming IO-390 Arrives - Tucked Away Under The Bench
12-31-2008
New Lycoming IO-390 Arrives!! Part 11
Lycoming IO-390 Arrives - Perfect Fit!
12-31-2008
New Lycoming IO-390 Arrives!! Part 10
Lycoming IO-390 Arrives - Removal From Pallet
12-31-2008
New Lycoming IO-390 Arrives!! Part 09
Lycoming IO-390 Arrives - Removal From Pallet
12-31-2008
New Lycoming IO-390 Arrives!! Part 08
Lycoming IO-390 Arrives - Engine Dolly
12-31-2008
New Lycoming IO-390 Arrives!! Part 07
Lycoming IO-390 Arrives - Harness and Gaskets
12-31-2008
New Lycoming IO-390 Arrives!! Part 06
Lycoming IO-390 Arrives - What's In The Box
12-31-2008
New Lycoming IO-390 Arrives!! Part 05
Lycoming IO-390 Arrives - What's In The Box
12-31-2008
New Lycoming IO-390 Arrives!! Part 04
Lycoming IO-390 Arrives - Vitran Truck Unloads
12-31-2008
New Lycoming IO-390 Arrives!! Part 02
Lycoming IO-390 Arrives - Vitran Truck Unloads
12-31-2008
New Lycoming IO-390 Arrives!! Part 01
Aero Sport Power Staff - New IO-390 Ready For Shipment!
12-19-2008
Aero Sport Power Staff - IO-390 Ready To Ship!
Lycoming IO-390 - Cylinders Added
12-12-2008
Aero Sport Power - Lycoming IO-390 - Assembly 2
Vetterman Exhaust - Complete System
12-10-2008
Vetterman Exhaust - IO-390 4-into-4 - Part 2
Vetterman Exhaust - Plain Brown Box
12-10-2008
Vetterman Exhaust - IO-390 4-into-4 - Part 1
Lycoming IO-390 - Crankshaft
12-10-2008
Aero Sport Power - Lycoming IO-390 - Assembly 1
Lycoming IO-390 - Parts Ready For Assembly
12-04-2008
Aero Sport Power - Lycoming IO-390 - Preassembly
11-28-2008
Ordered Lycoming IO-390











Copyright © 2008-2010 Matt Dralle. All Rights Reserved.