Matt's RV-8 Project



Matt Dralle's RV-8 Project
Work Logs Found: 1718
Category Work Time: 2987 Hours
 Date
Hours
Work Log Summary

Details

 07-19-2014
1.00
New Left Engine Baffle & Oil Cooler - Part 02
       

 07-19-2014
1.00
New Left Engine Baffle & Oil Cooler - Part 01
Details
       

 07-19-2014
1.00
Interior Parts Back From Powder Coaters - Part 02
       

 07-19-2014
1.00
Interior Parts Back From Powder Coaters - Part 01
Details
       

 06-29-2014
2.00
Baggage Door Assembly & Lift Strut - Part 04
       

 06-29-2014
2.00
Baggage Door Assembly & Lift Strut - Part 03
       

 06-29-2014
2.00
Baggage Door Assembly & Lift Strut - Part 02
Details
       

 06-29-2014
2.00
Baggage Door Assembly & Lift Strut - Part 01
Details
       

 06-21-2014
2.00
Rounding Bottom Flange of Baggage Door - Part 05
     

 06-21-2014
2.00
Rounding Bottom Flange of Baggage Door - Part 04
       

 06-21-2014
2.00
Rounding Bottom Flange of Baggage Door - Part 03
Details
       

 06-21-2014
2.00
Rounding Bottom Flange of Baggage Door - Part 02
Details
       

 06-21-2014
2.00
Rounding Bottom Flange of Baggage Door - Part 01
Details
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 10
     

 06-01-2014
2.00
Fuselage Wiring Complete - Part 09
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 08
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 07
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 06
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 05
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 04
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 03
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 02
       

 06-01-2014
2.00
Fuselage Wiring Complete - Part 01
Details
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 08
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 07
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 06
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 05
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 04
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 03
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 02
Details
       

 05-18-2014
2.00
Firewall-Forward Wiring Complete - Part 01
Details
       

 05-05-2014
1.00
Complete Schematics
Details
       

 04-20-2014
2.00
New PMag Electronic Ignition - Part 05
       

 04-20-2014
2.00
New PMag Electronic Ignition - Part 04
       

 04-20-2014
2.00
New PMag Electronic Ignition - Part 03
       

 04-20-2014
2.00
New PMag Electronic Ignition - Part 02
Details
       

 04-20-2014
2.00
New PMag Electronic Ignition - Part 01
Details
       

 03-29-2014
2.00
Riveting GPS Antenna Box To Firewall - Part 03
     

 03-29-2014
2.00
Riveting GPS Antenna Box To Firewall - Part 02
       

 03-29-2014
2.00
Riveting GPS Antenna Box To Firewall - Part 01
Details
       

 01-04-2014
2.00
Remounting Engine & Cowling - Part 05
     

 01-04-2014
2.00
Remounting Engine & Cowling - Part 04
       

 01-04-2014
2.00
Remounting Engine & Cowling - Part 03
Details
       

 01-04-2014
2.00
Remounting Engine & Cowling - Part 02
Details
       

 01-04-2014
2.00
Remounting Engine & Cowling - Part 01
Details
       

 12-29-2013
2.00
Adding Platenuts to Left Tank - Part 02
       

 12-29-2013
2.00
Adding Platenuts to Left Tank - Part 01
Details
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 09
     

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 08
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 07
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 06
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 05
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 04
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 03
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 02
Details
       

 08-03-2013
2.00
Windshield Mounting & Bezel Fabrication - Part 01
Details
       

 07-14-2013
1.00
Matt's KLVK ATC Streaming - Part 03
Details

 07-14-2013
1.00
Matt's KLVK ATC Streaming - Part - 02
Details

 07-14-2013
8.00
Matt's KLVK ATC Streaming - Part - 01
Details
     

 07-04-2013
0.10
Brady Wire Labeling System
Details
       

 06-29-2013
1.00
Rear Turtle Deck Skin - Part 03
       

 06-29-2013
1.00
Rear Turtle Deck Skin - Part 02
       

 06-29-2013
1.00
Rear Turtle Deck Skin - Part 01
Details
       

 06-29-2013
2.00
Canopy Bezel Fabrication - Part 04
       

 06-29-2013
2.00
Canopy Bezel Fabrication - Part 03
       

 06-29-2013
2.00
Canopy Bezel Fabrication - Part 02
       

 06-29-2013
2.00
Canopy Bezel Fabrication - Part 01
Details
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 10
     

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 09
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 08
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 07
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 06
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 05
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 04
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 03
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 02
       

 06-22-2013
2.00
Canopy Skirt Fitting & Mounting - Part 01
Details
       

 06-06-2013
1.00
Canopy Side Skirt Initial Fitting - Part 02
Details
       

 06-06-2013
1.00
Canopy Side Skirt Initial Fitting - Part 01
Details
       

 05-29-2013
1.00
Canopy Frame, Cutting, Tapping, Screws - Part 07
     

 05-29-2013
1.00
Canopy Frame, Cutting, Tapping, Screws - Part 06
       

 05-29-2013
1.00
Canopy Frame, Cutting, Tapping, Screws - Part 05
       

 05-29-2013
1.00
Canopy Frame, Cutting, Tapping, Screws - Part 04
       

 05-29-2013
1.00
Canopy Frame, Cutting, Tapping, Screws - Part 03
       

 05-29-2013
1.00
Canopy Frame, Cutting, Tapping, Screws - Part 02
       

 05-29-2013
32.00
Canopy Frame, Cutting, Tapping, Screws - Part 01
Details
       

 04-29-2013
1.00
Roto-Zip Tool For Canopy Cutting!
Details
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 07
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 06
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 05
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 04
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 03
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 02
Details
       

 04-28-2013
1.00
Plexiglass Canopy Initial Cut & Fit - Part 01
Details
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 8
     

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 7
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 6
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 5
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 4
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 3
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 2
Details
       

 04-18-2013
1.00
Canopy Tee-Rail Installation - Part 1
Details
       

 04-14-2013
1.00
Canopy Half-Open Latch System - Part 5
       

 04-14-2013
1.00
Canopy Half-Open Latch System - Part 4
       

 04-14-2013
1.00
Canopy Half-Open Latch System - Part 3
       

 04-14-2013
1.00
Canopy Half-Open Latch System - Part 2
Details
       

 04-14-2013
1.00
Canopy Half-Open Latch System - Part 1
Details
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 07
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 06
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 05
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 04
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 03
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 02
       

 03-31-2013
1.00
Rollbar, Backrest, Canopy Rails, & Latch - Part 01
Details
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 23
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 22
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 21
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 20
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 18
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 17
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 16
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 15
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 14
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 13
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 12
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 11
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 10
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 09
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 08
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 07
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 06
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 05
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 04
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 03
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 02
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part 01
Details
       

 03-17-2013
1.00
Avionics & Internal Wiring Complete - Part -19
       

 03-02-2013
1.00
Vertical Fin VOR/GS Ant & Fiberglass Tip - Part 05
     

 03-02-2013
1.00
Vertical Fin VOR/GS Ant & Fiberglass Tip - Part 04
       

 03-02-2013
1.00
Vertical Fin VOR/GS Ant & Fiberglass Tip - Part 03
       

 03-02-2013
1.00
Vertical Fin VOR/GS Ant & Fiberglass Tip - Part 02
       

 03-02-2013
1.00
Vertical Fin VOR/GS Ant & Fiberglass Tip - Part 01
Details
       

 02-09-2013
1.00
Magnetometer Installation - Part 04
Details
       

 02-09-2013
1.00
Magnetometer Installation - Part 03
       

 02-09-2013
1.00
Magnetometer Installation - Part 02
Details
       

 02-09-2013
6.00
Magnetometer Installation - Part 01
Details
       

 12-30-2012
1.00
Instrument Panel & Audio Mix Demo (YouTube Video)
Details
     

 12-27-2012
1.00
A/V Panel 2.0 & Connector Wiring - Part 04
     

 12-27-2012
1.00
A/V Panel 2.0 & Connector Wiring - Part 03
       

 12-27-2012
1.00
A/V Panel 2.0 & Connector Wiring - Part 02
       

 12-27-2012
1.00
A/V Panel 2.0 & Connector Wiring - Part 01
Details
       

 12-23-2012
1.00
Building An Audio/Video Panel - Part 04
       

 12-23-2012
1.00
Building An Audio/Video Panel - Part 03
       

 12-22-2012
1.00
Building An Audio/Video Panel - Part 02
Details
       

 12-22-2012
1.00
Building An Audio/Video Panel - Part 01
Details
       

 10-21-2012
1.00
Wiring The Stick Grips In - Part 02
       

 10-21-2012
1.00
Wiring The Stick Grips In - Part 01
Details
       

 10-20-2012
1.00
Wiring The Righthand Console - Part 04
       

 10-20-2012
1.00
Wiring The Righthand Console - Part 03
       

 10-20-2012
1.00
Wiring The Righthand Console - Part 02
Details
       

 10-20-2012
1.00
Wiring The Righthand Console - Part 01
Details
       

 02-20-2012
1.00
Bending The Trailing Edges - Part 03
       

 02-20-2012
1.00
Bending The Trailing Edges - Part 02
       

 02-20-2012
1.00
Bending The Trailing Edges - Part 01
Details
       

 02-19-2012
1.00
All New Elevators - Part 08
     

 02-19-2012
1.00
All New Elevators - Part 07
       

 02-19-2012
1.00
All New Elevators - Part 06
       

 02-19-2012
1.00
All New Elevators - Part 05
       

 02-19-2012
1.00
All New Elevators - Part 04
       

 02-19-2012
1.00
All New Elevators - Part 03
       

 02-19-2012
1.00
All New Elevators - Part 02
       

 02-19-2012
1.00
All New Elevators - Part 01
Details
       

 02-05-2012
1.00
Replacement Trim Tab - Part 09
       

 02-05-2012
1.00
Replacement Trim Tab - Part 08
       

 02-05-2012
1.00
Replacement Trim Tab - Part 07
       

 02-05-2012
1.00
Replacement Trim Tab - Part 06
       

 02-05-2012
1.00
Replacement Trim Tab - Part 05
       

 02-05-2012
1.00
Replacement Trim Tab - Part 04
       

 02-05-2012
1.00
Replacement Trim Tab - Part 03
       

 02-05-2012
1.00
Replacement Trim Tab - Part 02
       

 02-05-2012
1.00
Replacement Trim Tab - Part 01
Details
       

 12-25-2011
1.00
Mounting The Vertical Stabilizer - Part 02
       

 12-25-2011
1.00
Mounting The Vertical Stabilizer - Part 01
Details
       

 12-25-2011
1.00
Mounting The Horizontal Stabilizer - Part 03
       

 12-25-2011
1.00
Mounting The Horizontal Stabilizer - Part 02
       

 12-25-2011
1.00
Mounting The Horizontal Stabilizer - Part 01
Details
       

 12-25-2011
2.00
Fuel Selector Valve Cover
Details
       

 08-16-2011
1.00
Instrument Panel Loaded
Details
       

 08-15-2011
1.00
Avionics & AHRS Leveling Brackets - Part 04
       

 08-15-2011
2.00
Avionics & AHRS Leveling Brackets - Part 03
       

 08-15-2011
3.00
Avionics & AHRS Leveling Brackets - Part 02
Details
       

 08-15-2011
3.00
Avionics & AHRS Leveling Brackets - Part 01
Details
       

 08-14-2011
0.10
Recoilless Bucking Bar
Details
     

 08-14-2011
2.00
Bulkheads, Amenities & Cable Conduits - Part 05
     

 08-14-2011
2.00
Bulkheads, Amenities & Cable Conduits - Part 04
       

 08-14-2011
2.00
Bulkheads, Amenities & Cable Conduits - Part 03
       

 08-14-2011
2.00
Bulkheads, Amenities & Cable Conduits - Part 02
Details
       

 08-14-2011
2.00
Bulkheads, Amenities & Cable Conduits - Part 01
Details
       

 08-13-2011
1.00
Canopy Side Rail Fuselage Riveting - Part 04
       

 08-13-2011
2.00
Canopy Side Rail Fuselage Riveting - Part 03
       

 08-13-2011
1.00
Canopy Side Rail Fuselage Riveting - Part 02
Details
       

 08-13-2011
2.00
Canopy Side Rail Fuselage Riveting - Part 01
Details
       

 08-10-2011
1.00
Cabin Heat & Alt Air Controls - Part 02
       

 08-10-2011
2.00
Cabin Heat & Alt Air Controls - Part 01
Details
       

 08-07-2011
1.00
Geartower Wriing Holes & Grounding Plane
Details
       

 08-06-2011
3.00
Baggage Area Avionics Mounting - Part 05
       

 08-06-2011
3.00
Baggage Area Avionics Mounting - Part 04
       

 08-06-2011
3.00
Baggage Area Avionics Mounting - Part 03
       

 08-06-2011
3.00
Baggage Area Avionics Mounting - Part 02
       

 08-06-2011
3.00
Baggage Area Avionics Mounting - Part 01
Details
       

 07-31-2011
2.00
Kenwood Stereo Remote Box - Part 02
     

 07-31-2011
2.00
Kenwood Stereo Remote Box - Part 01
Details
       

 07-31-2011
2.00
Controls, Aileron Autopilot/Trim Servos - Part 03
     

 07-31-2011
2.00
Controls, Aileron Autopilot/Trim Servos - Part 02
       

 07-31-2011
2.00
Controls, Aileron Autopilot/Trim Servos - Part 01
Details
       

 07-30-2011
2.00
Aileron Trim & Autopilot Servo Mounts - Part 02
     

 07-30-2011
2.00
Aileron Trim & Autopilot Servo Mounts - Part 01
       

 07-29-2011
1.00
Pilot's Seatbelt Attach Modification - Part 01
       

 07-29-2011
1.00
Battery Box, Strobe Power, Etc Installed - Part 02
     

 07-29-2011
1.00
Battery Box, Strobe Power, Etc Installed - Part 01
Details
       

 07-27-2011
1.00
Battery Ground Plane Installed - Part 02
       

 07-27-2011
1.00
Battery Ground Plane Installed - Part 01
Details
       

 07-26-2011
1.00
Ground Power Plug Mounted - Part 03
       

 07-26-2011
1.00
Ground Power Plug Mounted - Part 02
       

 07-26-2011
1.00
Ground Power Plug Mounted - Part 01
Details
       

 07-25-2011
2.00
Mounting Elevator Bellcrank & AP Servo - Part 02
       

 07-25-2011
2.00
Mounting Elevator Bellcrank & AP Servo - Part 01
Details
       

 07-25-2011
1.00
Flap Weldment, Motor & Sensor Mounted - Part 06
     

 07-25-2011
1.00
Flap Weldment, Motor & Sensor Mounted - Part 05
       

 07-25-2011
1.00
Flap Weldment, Motor & Sensor Mounted - Part 04
       

 07-25-2011
1.00
Flap Weldment, Motor & Sensor Mounted - Part 03
       

 07-25-2011
1.00
Flap Weldment, Motor & Sensor Mounted - Part 02
       

 07-25-2011
1.00
Flap Weldment, Motor & Sensor Mounted - Part 01
Details
       

 07-24-2011
2.00
Mounting Oxygen Controller - Part 02
       

 07-24-2011
2.00
Mounting Oxygen Controller - Part 01
Details
       

 07-23-2011
3.00
Front & Rear Throttle Quadrant - Part 04
       

 07-23-2011
3.00
Front & Rear Throttle Quadrant - Part 03
       

 07-23-2011
3.00
Front & Rear Throttle Quadrant - Part 02
       

 07-22-2011
2.00
Front & Rear Throttle Quadrant - Part 01
Details
       

 07-20-2011
1.00
Quadrant Cables & Firewall Gimbals - Part 05
       

 07-20-2011
1.00
Quadrant Cables & Firewall Gimbals - Part 04
       

 07-20-2011
1.00
Quadrant Cables & Firewall Gimbals - Part 03
       

 07-18-2011
1.00
Quadrant Cables & Firewall Gimbals - Part 02
Details
       

 07-18-2011
1.00
Quadrant Cables & Firewall Gimbals - Part 01
Details
       

 07-17-2011
2.00
Rudder Pedal & Cable Assembly - Part 03
       

 07-17-2011
3.00
Rudder Pedal & Cable Assembly - Part 02
       

 07-17-2011
3.00
Rudder Pedal & Cable Assembly - Part 01
Details
       

 07-16-2011
2.00
Fuel Vent & Brake Line Installation - Part - 04
     

 07-16-2011
2.00
Fuel Vent & Brake Line Installation - Part - 03
       

 07-16-2011
2.00
Fuel Vent & Brake Line Installation - Part - 02
Details
       

 07-16-2011
2.00
Fuel Vent & Brake Line Installation - Part - 01
Details
       

 07-15-2011
4.00
Fuel Pump, Filter, and Line Installation - Part 03
       

 07-15-2011
4.00
Fuel Pump, Filter, and Line Installation - Part 02
       

 07-15-2011
4.00
Fuel Pump, Filter, and Line Installation - Part 01
Details
       

 07-09-2011
8.00
Bose A20 Headset - Auto On Modification
Details
       

 07-02-2011
4.00
Deconstructing The Panel Wiring
Details
       

 07-01-2011
0.10
Let The Rebuild Begin...
Details
     

 07-01-2011
2.00
Deconstructing Ruby - Part 08
       

 07-01-2011
2.00
Deconstructing Ruby - Part 07
       

 07-01-2011
2.00
Deconstructing Ruby - Part 06
       

 07-01-2011
2.00
Deconstructing Ruby - Part 05
       

 07-01-2011
2.00
Deconstructing Ruby - Part 04
       

 07-01-2011
2.00
Deconstructing Ruby - Part 03
Details
       

 07-01-2011
2.00
Deconstructing Ruby - Part 02
Details
       

 07-01-2011
2.00
Deconstructing Ruby - Part 01
Details
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 11
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 10
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 09
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 08
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 07
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 06
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 05
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 04
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 03
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 02
       

 06-18-2011
0.20
Trip Home From The Hangar - Part 01
Details
       

 06-12-2011
0.50
Right Side NACA Vent - Part 03
     

 06-12-2011
1.00
Right Side NACA Vent - Part 02
       

 06-12-2011
0.50
Right Side NACA Vent - Part 01
Details
       

 06-10-2011
1.00
New Baby's First Bath - Part 02
       

 06-10-2011
1.00
New Baby's First Bath - Part 01
Details
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 07
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 06
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 05
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 04
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 03
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 02
       

 06-03-2011
0.10
Unpacking Those Giant Crates - Part 01
Details
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 20
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 19
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 18
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 17
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 16
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 15
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 14
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 13
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 12
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 11
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 10
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 08
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 07
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 06
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 05
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 04
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 03
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 02
       

 06-03-2011
0.10
Rebuild Kit Arrives - Part 01
Details
       

 05-23-2011
0.50
Replacement Grove Airfoiled Gear Arrive
Details
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 07
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 06
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 05
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 04
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 03
Details
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 02
Details
       

 05-02-2011
1.00
Landing Mishap - Damage Assement - Part 01
Details
       

 04-24-2011
1.00
New Tailwheel & Steering Arm - Part 2
       

 04-24-2011
1.00
New Tailwheel & Steering Arm - Part 1
Details
       

 11-28-2010
1.00
Test Flight Video - Part 1 - Takeoff - 1080p HD
Details
     

 11-27-2010
1.00
Test Flight Video - Part 2 - Landing - 1080p HD
Details
     

 10-24-2010
3.00
Oil Cooler Mount Cracking & Replacement - Part 4
       

 10-24-2010
3.00
Oil Cooler Mount Cracking & Replacement - Part 3
       

 10-24-2010
3.00
Oil Cooler Mount Cracking & Replacement - Part 2
Details
       

 10-24-2010
3.00
Oil Cooler Mount Cracking & Replacement - Part 1
Details
       

 07-25-2010
1.00
EGT Probe Replacement #2 Cylinder
Details
       

 07-24-2010
1.00
Replacement Oil Door & Hartwell Latches - Part 4
     

 07-24-2010
5.00
Replacement Oil Door & Hartwell Latches - Part 3
       

 07-24-2010
5.00
Replacement Oil Door & Hartwell Latches - Part 2
Details
       

 07-24-2010
5.00
Replacement Oil Door & Hartwell Latches - Part 1
Details
       

 07-23-2010
2.00
Wheelpants - A Second Try - Part 11
     

 07-22-2010
2.00
Wheelpants - A Second Try - Part 10
       

 07-22-2010
2.00
Wheelpants - A Second Try - Part 09
       

 07-21-2010
2.00
Wheelpants - A Second Try - Part 08
       

 07-21-2010
2.00
Wheelpants - A Second Try - Part 07
       

 07-20-2010
2.00
Wheelpants - A Second Try - Part 06
       

 07-20-2010
2.00
Wheelpants - A Second Try - Part 05
       

 07-19-2010
2.00
Wheelpants - A Second Try - Part 04
       

 07-19-2010
2.00
Wheelpants - A Second Try - Part 03
       

 07-18-2010
8.00
Wheelpants - A Second Try - Part 02
Details
       

 07-17-2010
8.00
Wheelpants - A Second Try - Part 01
Details
       

 06-20-2010
1.00
Recal Of Priceton Fuel Level Probes Successful!
Details

 04-23-2010
2.00
Third Taxi Test - Brakes Overheat - Part 3
Details
     

 04-23-2010
1.00
Third Taxi Test - Brakes Overheat - Part 2
Details
       

 04-23-2010
1.00
Third Taxi Test - Brakes Overheat - Part 1
Details
       

 04-22-2010
2.00
N998RV Signed Off By FAA!
Details
       

 04-21-2010
2.00
Part 91.411 & 91.413 Static & Pitot Testing
Details
     

 04-19-2010
1.00
Alternate Static Air Port
Details
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 22
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 21
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 20
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 19
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 18
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 17
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 16
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 15
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 14
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 13
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 12
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 11
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 10
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 09
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 08
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 07
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 06
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 05
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 04
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 03
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 02
       

 04-17-2010
0.25
Taxi Tests & Magnetometer Calibration - Part 01
Details
       

 04-17-2010
1.00
Oil Cooler Mounting Flange Modifications - Part 2
       

 04-17-2010
1.00
Oil Cooler Mounting Flange Modifications - Part 1
Details
       

 04-17-2010
1.00
First Taxi Test - HD Videos
Details
       

 04-17-2010
1.00
Engine Cowling Baffle Seals
Details
       

 04-17-2010
3.00
Bias Resistors For Westach Hall-Effect RPM Sensors
Details
       

 04-16-2010
3.00
New Fuel Pressure Transducer Fitting
Details
       

 04-13-2010
1.00
Instrumentation Check Out
Details
     

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 16
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 15
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 14
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 13
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 12
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 11
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 10
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 09
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 08
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 07
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 06
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 05
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 04
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 03
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 02
Details
       

 04-10-2010
0.50
Lycoming IO-390 First Engine Start - Part 01
Details
       

 04-10-2010
1.00
Custom Fuel Cap Engraving
Details
     

 04-09-2010
0.50
Adding Die-Cut Vinyl N Numbers - Part 6
       

 04-09-2010
0.50
Adding Die-Cut Vinyl N Numbers - Part 5
       

 04-09-2010
0.50
Adding Die-Cut Vinyl N Numbers - Part 4
       

 04-09-2010
0.50
Adding Die-Cut Vinyl N Numbers - Part 3
       

 04-09-2010
0.50
Adding Die-Cut Vinyl N Numbers - Part 2
       

 04-09-2010
0.50
Adding Die-Cut Vinyl N Numbers - Part 1
Details
       

 04-08-2010
1.00
Weighing The Monster - Part 7
       

 04-08-2010
1.00
Weighing The Monster - Part 6
       

 04-08-2010
1.00
Weighing The Monster - Part 5
       

 04-08-2010
1.00
Weighing The Monster - Part 4
       

 04-08-2010
1.00
Weighing The Monster - Part 3
       

 04-08-2010
1.00
Weighing The Monster - Part 2
Details
       

 04-08-2010
1.00
Weighing The Monster - Part 1
Details
       

 04-05-2010
2.00
Bleeding The Brakes - Part 2
Details
       

 04-05-2010
3.00
Bleeding The Brakes - Part 1
Details
       

 04-04-2010
2.00
Calibrating Princeton Capacitive Probes - Part 4
     

 04-04-2010
2.00
Calibrating Princeton Capacitive Probes - Part 3
Details
       

 04-04-2010
2.00
Calibrating Princeton Capacitive Probes - Part 2
Details
       

 04-04-2010
1.00
Calibrating Princeton Capacitive Probes - Part 1
Details
       

 04-03-2010
1.00
Final Wing Spar Bolting - Part 4
       

 04-03-2010
1.00
Final Wing Spar Bolting - Part 3
       

 04-03-2010
1.00
Final Wing Spar Bolting - Part 2
       

 04-03-2010
1.00
Final Wing Spar Bolting - Part 1
Details
       

 03-20-2010
0.10
Trip To The Airport - Part 12
       

 03-20-2010
0.10
Trip To The Airport - Part 11
       

 03-20-2010
0.10
Trip To The Airport - Part 10
       

 03-20-2010
0.10
Trip To The Airport - Part 09
       

 03-20-2010
0.10
Trip To The Airport - Part 08
       

 03-20-2010
0.10
Trip To The Airport - Part 07
       

 03-20-2010
0.10
Trip To The Airport - Part 06
       

 03-20-2010
1.00
Trip To The Airport - Part 05
       

 03-20-2010
1.00
Trip To The Airport - Part 04
       

 03-20-2010
1.00
Trip To The Airport - Part 03
       

 03-20-2010
1.00
Trip To The Airport - Part 02
       

 03-20-2010
1.00
Trip To The Airport - Part 01
Details
       

 03-18-2010
1.00
Finally Ready To Move To Hangar - Part 4
       

 03-17-2010
1.00
Finally Ready To Move To Hangar - Part 3
       

 03-16-2010
1.00
Finally Ready To Move To Hangar - Part 2
       

 03-15-2010
1.00
Finally Ready To Move To Hangar - Part 1
Details
       

 03-14-2010
2.00
Lower Tail Fairing Installation - Part 4
     

 03-14-2010
2.00
Lower Tail Fairing Installation - Part 3
       

 03-14-2010
2.00
Lower Tail Fairing Installation - Part 2
       

 03-14-2010
2.00
Lower Tail Fairing Installation - Part 1
Details
       

 03-13-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 8
     

 03-13-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 7
       

 03-13-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 6
       

 03-13-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 5
       

 03-12-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 4
       

 03-12-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 3
       

 03-11-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 2
       

 03-11-2010
2.00
Upper Fiberglass Tail Fairing Install - Part 1
Details
       

 03-10-2010
3.00
Cowling Pin Covers Redo - Part 1
Details
       

 03-08-2010
1.00
Tailwheel Springs Installation - Part 2
       

 03-08-2010
2.00
Tailwheel Springs Installation - Part 1
Details
       

 03-07-2010
1.00
Outside Air Temperature (OAT) Probe - Part 2
       

 03-07-2010
1.00
Outside Air Temperature (OAT) Probe - Part 1
Details
       

 03-07-2010
4.00
GRT Magnetometer Installation In Tail - Part 3
       

 03-06-2010
3.00
GRT Magnetometer Installation In Tail - Part 2
       

 03-06-2010
3.00
GRT Magnetometer Installation In Tail - Part 1
Details
       

 03-06-2010
1.00
Adding Rudder Cable Exit Covers - Part 2
       

 03-06-2010
1.00
Adding Rudder Cable Exit Covers - Part 1
Details
       

 03-05-2010
1.00
Cowling Installation Complete - Part 2
       

 03-05-2010
1.00
Cowling Installation Complete - Part 1
Details
       

 02-28-2010
1.50
Hartzell Prop Bolt Torque & Safety Wiring - Part 2
       

 02-28-2010
1.50
Hartzell Prop Bolt Torque & Safety Wiring - Part 1
Details
       

 02-28-2010
0.50
Closing The Left & Right Fuel Tanks - Part 5
       

 02-28-2010
0.50
Closing The Left & Right Fuel Tanks - Part 4
       

 02-28-2010
1.00
Closing The Left & Right Fuel Tanks - Part 3
Details
       

 02-28-2010
1.00
Closing The Left & Right Fuel Tanks - Part 2
Details
       

 02-28-2010
1.00
Closing The Left & Right Fuel Tanks - Part 1
Details
       

 02-27-2010
0.50
Spark Plugs & Ignition Harness - Part 6
       

 02-27-2010
0.50
Spark Plugs & Ignition Harness - Part 5
       

 02-27-2010
0.50
Spark Plugs & Ignition Harness - Part 4
       

 02-27-2010
0.50
Spark Plugs & Ignition Harness - Part 3
       

 02-27-2010
0.50
Spark Plugs & Ignition Harness - Part 2
       

 02-27-2010
0.50
Spark Plugs & Ignition Harness - Part 1
Details
       

 02-27-2010
0.25
Oil Filler Tube Installation - Part 2
     

 02-27-2010
0.25
Oil Filler Tube Installation - Part 1
Details
       

 02-25-2010
4.00
Surface Finishing The Pink Cowling Pieces - Part 6
     

 02-25-2010
4.00
Surface Finishing The Pink Cowling Pieces - Part 5
       

 02-24-2010
4.00
Surface Finishing The Pink Cowling Pieces - Part 4
       

 02-24-2010
4.00
Surface Finishing The Pink Cowling Pieces - Part 3
       

 02-23-2010
4.00
Surface Finishing The Pink Cowling Pieces - Part 2
       

 02-23-2010
4.00
Surface Finishing The Pink Cowling Pieces - Part 1
Details
       

 02-22-2010
1.00
Cowling Inlet Duct Baffles - Part 5
     

 02-22-2010
1.00
Cowling Inlet Duct Baffles - Part 4
       

 02-22-2010
1.00
Cowling Inlet Duct Baffles - Part 3
       

 02-22-2010
2.00
Cowling Inlet Duct Baffles - Part 2
       

 02-22-2010
2.00
Cowling Inlet Duct Baffles - Part 1
Details
       

 02-21-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 13
       

 02-21-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 12
       

 02-21-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 11
       

 02-20-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 10
       

 02-20-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 09
       

 02-20-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 08
       

 02-20-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 07
       

 02-19-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 06
       

 02-19-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 05
       

 02-19-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 04
       

 02-18-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 03
Details
       

 02-18-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 02
Details
       

 02-18-2010
2.00
Wheel Pant Gear Fairing Fabrication - Part 01
Details
       

 02-18-2010
1.00
Silicone Winscreen Internal Fillet - Part 2
       

 02-18-2010
1.00
Silicone Winscreen Internal Fillet - Part 1
Details
       

 02-17-2010
1.00
Cowling Pin Retainers - Part 6
     

 02-17-2010
1.00
Cowling Pin Retainers - Part 5
       

 02-16-2010
1.00
Cowling Pin Retainers - Part 4
       

 02-16-2010
1.00
Cowling Pin Retainers - Part 3
       

 02-15-2010
1.00
Cowling Pin Retainers - Part 2
       

 02-15-2010
1.00
Cowling Pin Retainers - Part 1
Details
       

 02-14-2010
8.00
Windscreen Fiberglass Bezel Refinishing - Part 2
       

 02-12-2010
8.00
Windscreen Fiberglass Bezel Refinishing - Part 1
Details
       

 02-08-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 11
       

 02-07-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 10
       

 02-06-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 09
       

 02-04-2010
2.00
Fiberglass Windscreen Bezel Fabrication - Part 08
       

 02-03-2010
2.00
Fiberglass Windscreen Bezel Fabrication - Part 07
       

 02-02-2010
2.00
Fiberglass Windscreen Bezel Fabrication - Part 06
       

 02-01-2010
2.00
Fiberglass Windscreen Bezel Fabrication - Part 05
       

 01-31-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 04
       

 01-30-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 03
Details
       

 01-24-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 02
Details
       

 01-23-2010
8.00
Fiberglass Windscreen Bezel Fabrication - Part 01
Details
       

 01-21-2010
0.10
Canopy Installation Complete - Part 4
     

 01-21-2010
0.10
Canopy Installation Complete - Part 3
       

 01-21-2010
0.10
Canopy Installation Complete - Part 2
       

 01-21-2010
0.10
Canopy Installation Complete - Part 1
Details
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 12
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 11
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 10
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 09
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 08
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 07
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 06
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 05
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 04
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 03
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 02
       

 01-20-2010
0.10
Plexiglass Canopy Installation Cam Shots - Part 01
Details
       

 01-19-2010
1.00
Labeling Canopy Side Panels - Part 4
       

 01-19-2010
1.00
Labeling Canopy Side Panels - Part 3
       

 01-19-2010
1.00
Labeling Canopy Side Panels - Part 2
       

 01-19-2010
1.00
Labeling Canopy Side Panels - Part 1
Details
       

 01-18-2010
1.00
Canopy Rail & Frame Installation Complete - Part 5
       

 01-18-2010
1.00
Canopy Rail & Frame Installation Complete - Part 4
       

 01-18-2010
2.00
Canopy Rail & Frame Installation Complete - Part 3
       

 01-18-2010
2.00
Canopy Rail & Frame Installation Complete - Part 2
       

 01-18-2010
2.00
Canopy Rail & Frame Installation Complete - Part 1
Details
       

 01-17-2010
1.00
Fuel Pump Covers Installed
Details
     

 01-16-2010
2.00
Rear Roll Bar Installation Complete - Part 2
       

 01-16-2010
2.00
Rear Roll Bar Installation Complete - Part 1
Details
       

 01-14-2010
1.00
Instrument Panel Installation Complete - Part 5
     

 01-14-2010
1.00
Instrument Panel Installation Complete - Part 4
       

 01-14-2010
1.00
Instrument Panel Installation Complete - Part 3
       

 01-14-2010
1.00
Instrument Panel Installation Complete - Part 2
       

 01-14-2010
1.00
Instrument Panel Installation Complete - Part 1
Details
       

 01-14-2010
2.00
Adding Front Grip Label To Instrument Panel
Details
       

 01-12-2010
1.00
Sealing Windscreen Bezel To Plexi - Part 3
       

 01-12-2010
2.00
Sealing Windscreen Bezel To Plexi - Part 2
       

 01-12-2010
2.00
Sealing Windscreen Bezel To Plexi - Part 1
Details
       

 01-07-2010
1.00
GPS Antenna Tray Complete
Details
     

 01-06-2010
1.00
Oxygen Tank Installation Complete - Part 3
     

 01-06-2010
2.00
Oxygen Tank Installation Complete - Part 2
       

 01-06-2010
2.00
Oxygen Tank Installation Complete - Part 1
Details
       

 01-05-2010
2.00
GRT EIS-4000 Replacement Bezel
Details
       

 01-01-2010
1.00
Rear Belt Installation Complete - Part 3
     

 01-01-2010
1.00
Rear Belt Installation Complete - Part 2
       

 01-01-2010
1.00
Rear Belt Installation Complete - Part 1
Details
       

 12-31-2009
3.00
Oxygen System EDS O2D2 Installation Complete
Details
       

 12-31-2009
1.00
Miscellaneous Labeling Complete - Part 3
     

 12-31-2009
1.00
Miscellaneous Labeling Complete - Part 2
       

 12-31-2009
1.00
Miscellaneous Labeling Complete - Part 1
Details
       

 12-30-2009
4.00
Righthand Console Installation & Labeling Complete
Details
       

 12-30-2009
4.00
Rear Baggage Area Covers Complete
Details
       

 12-29-2009
8.00
Throttle Quadrant Installation Complete
Details
       

 12-28-2009
7.00
Battery, GPU, Strobe PS, AP Servo & Rear Breakers
Details
       

 12-27-2009
7.00
Front Baggage Area Complete
Details
       

 12-27-2009
1.00
AHRS Alignment Adjustment
Details
       

 12-26-2009
1.00
Main Instrument Panel Final Assembly - Part 3
     

 12-26-2009
2.00
Main Instrument Panel Final Assembly - Part 2
       

 12-26-2009
2.00
Main Instrument Panel Final Assembly - Part 1
Details
       

 12-26-2009
2.00
Left & Right Insturment Panel Mounts - Part 2
       

 12-26-2009
2.00
Left & Right Instrument Panel Mounts - Part 1
Details
       

 12-25-2009
2.00
Rudder Pedal Installation Complete - Part 2
     

 12-25-2009
2.00
Rudder Pedal Installation Complete - Part 1
Details
       

 12-25-2009
2.00
Fuel System Installation Complete - Part 2
       

 12-25-2009
2.00
Fuel System Installation Complete - Part 1
Details
       

 12-24-2009
1.00
Kenwood Remount & Dimmer Box Reassembly
Details
       

 12-23-2009
1.00
Fuselage Interior Paint Complete - Part 3
       

 12-23-2009
1.00
Fuselage Interior Paint Complete - Part 2
       

 12-23-2009
2.00
Fuselage Interior Paint Complete - Part 1
Details
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 8
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 7
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 6
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 5
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 4
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 3
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 2
       

 12-22-2009
0.10
Coming Home From Interior Painting - Part 1
Details
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 7
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 6
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 5
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 4
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 3
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 2
       

 12-21-2009
0.10
Fuselage Interior Priming & Painting - Part 1
Details
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 17
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 16
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 15
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 14
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 13
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 12
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 11
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 10
       

 12-17-2009
0.10
Hauling The Fuselage To The Paint Shop - Part 09